ECC 8 - Long delay at A10 toucan crossing Salmons Brook

Please sign in to vote.

Added by Oliver Bruckauf

There is a 40-second or more delay after pushing the button before the ped/cycle phase (on the west side of the crossing) at the A10 toucan crossing Salmons Brook. This delay leads to some people risking crossing outside of the green phase on a 40mph road where speeding is rife.
20 seconds would be more acceptable, as for the east side of the crossing.

Location

Issues nearby
Back to top