Things tagged 'quietway'

limited to the area of Hackney Cycling Campaign:

12 issues found for 'quietway':

  • Central London Cycle Grid Section 1: Queensbridge Rd b/w Hackney Rd & Whiston Rd

    Created by Simon Munk // 1 thread

    From Hackney council:

    Help us improve cycling on Queensbridge Road between Hackney Road and Whiston Road

    We are seeking your views on proposals that will create a protected cycling route along Queensbridge Road to form part of a network of safe cycling routes between the Quietway link at Whiston Road and Quietway 13 at Columbia Road.

    Hackney Council is working in partnership with Tower Hamlets and Transport for London (TfL) to make cycle accessibility improvements on Queensbridge Road from Hackney Road to Dalston Lane as part of the Central London Cycle Grid (CLCG) from Bethnal Green to Dalston Lane. The improvements at Queensbridge Road are being developed in three sections:

    • Section I: Hackney Road – Whiston Road
    • Section II: Whiston Road – Middleton Road
    • Section III: Middleton Road – Dalston Lane

    Hackney, Tower Hamlets, and TfL are committed to making our streets safer for everyone. These changes aim to encourage more walking and cycling, improve air quality and reduce emissions within the local area. Hackney and Tower Hamlets recognise that streets are not just places to park vehicles or drive, but to walk and cycle on too. They are the places where we socialise and live our lives. An aspiration of both boroughs is to reclaim streets from motor traffic and congestion and transform them into attractive and liveable neighbourhoods.

    Queensbridge Road is one such street. Although it is a relatively wide road (about 10.5 metres wide), it was designed for the rapid transit of motorised vehicles and parking. The traffic islands and hatched road markings leave little room for other road users such as pedal cyclists and pedestrians. Between Hackney Road and Whiston Road, 28 collisions were recorded between 2013 and 2017. Sixteen of them involved pedal cyclists.

    The proposed improvements would change the nature of Queensbridge Road to make it a healthier, safer and more pleasant environment for walking and cycling, reflecting the needs of the local area, including its residential estates, Haggerston Park and Haggerston School.

    What are the proposals?

    The following measures are proposed:

    Queensbridge Road raised cycle tracks

    • Installing two metre wide raised cycle tracks between Hackney Road and Whiston Road. These will be next to the existing pavements on both sides of the road. The raised cycle tracks will be separated from motorised traffic by a kerb and from pedestrians by a pedestrian/cycle separator (see example of a separator on page 11 in the FAQs section).
    • Installing a mandatory cycle lane on the carriageway next to the cycle hire scheme at Kent Street.

    Dunloe Street shared zebra crossing

    • Installing a raised table with a parallel pedestrian/cycle crossing (shared zebra crossing for pedestrians and cyclists) at the junction of Dunloe Street and Queensbridge Road. The parallel crossing will allow cyclists and pedestrians to cross Queensbridge Road under the controlled conditions of a zebra crossing. The raised junction table will provide a step-free pedestrian crossing and help with encouraging drivers to keep to the 20mph speed limit.
    • Closing Dunloe Street on both arms with Queensbridge Road to motor traffic to reduce the potential conflict between turning traffic and pedal cyclists and reduce rat running.

    Hackney Road junction improvements

    • Installing a raised entry table at the junction of Hackney Road and Horatio Street to provide pedestrians with step-free crossing facilities.
    • Replacing the existing traffic islands on Hackney Road with wider pedestrian-friendly traffic islands.
    • Refurbishing the road and pavements around the junction.
    • Removing clutter such as redundant guard railings and signs at the junction. Installing double yellow lines between the pedestrian crossings at the junction.
    • Installing low level cycle signals with early release crossing facilities for cyclists at Queensbridge Road and Horatio Street, subject to junction capacity.

    Kent Street raised entry table and zebra crossing

    • Installing a raised entry table at the junction of Kent Street and Queensbridge Road for a step-free pedestrian/cycle crossing at this location.
    • Installing a raised table for the existing zebra crossing at Edith Street to provide controlled step-free crossing facilities for pedestrians when crossing Queensbridge Road. Due to the nature of the road at this location, a parallel pedestrian/ cycle crossing was considered unsuitable.

    Refurbishment of pavements and carriageways

    • The existing pavements adjacent to the raised cycle tracks will be refurbished using standard paving materials. Blended pedestrian crossings will be installed at Kent Street and Dunloe Street side road junctions to highlight the priority of pedestrians over pedal cycles and motorised traffic from the side roads (see example of a blended crossing on page 11 in the FAQs section).

    Whiston Road junction

    • Installing ‘advanced stop lines’ (ASLs) for cyclists at the southern arm of Queensbridge Road connected to the raised cycle track with road markings.
    • Low level cycle signals with early release crossing facilities for cyclists will be considered as part of Section II between Whiston Road and Middleton Road.

    Please download the plans below for more details

    Layout plans from Hackney Road to Whiston Road

    Location plan

    Layout plans from Hackney Road to Whiston Road

    Detail 1: Dunloe Street junction

    Detail 2: Hackney Road junction

    Detail 3: Kent Road junction

    What are the potential impacts of the proposals?

    • If approved, these proposals would provide safe, protected cycling facilities for cyclists between Hackney Road and Whiston Road. Six collisions resulting in slight personal injuries were recorded in 2017 between Hackney Road and Whiston Road, three of which involved pedal cyclists.
    • They would also provide step free crossing facilities for pedestrians at side roads and at controlled pedestrian crossing points.
    • The reduced road width would help reduce the average traffic speeds (outside Haggerston School) to under 20mph.
    • The proposals would help improve accessibility for pedal cyclists and pedestrians at major junctions such as at Hackney Road.
    • Schemes of this nature are expected to contribute to improved air quality as they both regulate private motor vehicle traffic and reduce capacity. The introduction of cycle lanes also increases the distance between polluting vehicles and pedestrians and residents, reducing the effects of pollution.

    Parking

    • The proposals would affect all the parking on Queensbridge Road between Hackney Road and Whiston Road where the existing parking bays will be removed.
    • The existing car club and loading bay at Queensbridge Road will be relocated to Dunloe Street (east). A new electric charging point will also be installed on the same bay.
    • A parking stress survey confirmed that the existing parking bays on the side roads are able to absorb the impact of displaced cars from Queensbridge Road.
    • The existing residents parking bay on Horatio Street would be changed slightly to create space for passing cyclists.
    • The single yellow line between pedestrian crossings at the Hackney Road junction would be converted to double yellow lines.
    • Parking for visitors to the Columbia Road Flower Market would still be available at the ‘pay and display’ parking bays on Yorkton Street, Scawfell Street and Thurtle Road.

    Future schemes

    The rest of the cycle grid to the north of Whiston Road will be consulted on and developed as follows:

    • Section II: Whiston Road to Middleton Road (2020–2021)
    • Section III: Middleton Road to Dalston Lane (2021–2022)

    What happens next?

    Your views will be taken into account as part of the detailed design process. We will publish the consultation responses as well as the decisions made at consultations.hackney.gov.uk  

    To keep up to date with this and other plans, please visit hackney.gov.uk/street-consultations

    Permanent works

    If the scheme goes ahead, following consultation, we expect construction works to start in January 2020.

    Frequently Asked Questions

    Q. What is a raised cycle track? Can pedestrians and motorised traffic use the cycle track?

    A. A raised cycle track is a section of highway where pedal cyclists have right of way. It is vertically separated from motorised traffic by a kerb and from pedestrians by a raised pedestrian/cycle separator.

    Q. What is a parallel pedestrian and cyclist crossing? Who has priority when crossing the road on this type of crossing?

    A. A parallel pedestrian and cyclist crossing works like a zebra crossing that allows cyclists and pedestrians to cross the road, giving priority over motorised traffic. Vehicles should stop at the ‘Give Way’ road markings, as in conventional zebra crossings.

    Q. What are blended pedestrian crossings and will traffic give way to pedestrians at them?

    A. Blended crossings are pedestrian crossing points designed to slow down vehicles when entering or exiting side roads, encouraging vehicles to give way to pedestrians crossing the road.

    Q. What is a parallel pedestrian and cyclist crossing? Who has priority when crossing the road on this type of crossing?

    A. A parallel pedestrian and cyclist crossing works like a zebra crossing that allows cyclists and pedestrians to cross the road, giving priority over motorised traffic. Vehicles should stop at the ‘Give Way’ road markings, as in conventional zebra crossings

    Please sign in to vote.
  • Lea Bridge - Dalston cycle route

    Created by Simon Munk // 2 threads

    This 3km route would fill the gap between Lea Bridge and the existing cycle route between the City and Tottenham at Dalston. From Lea Bridge the proposed route heads towards Lea Bridge Road to Lea Bridge roundabout, after which it joins quieter back streets including Downs Park Road and Sandringham Road to connect through to Dalston.

    Please sign in to vote.
  • Finsbury Park to Highbury Fields Cycleway (QW10)

    Created by grahamparks // 1 thread

    We are now consulting on the Finsbury Park to Highbury Fields part of a future Cycleway between Farringdon and Palmers Green which has been developed in partnership with Transport for London. This new Cycleway route has been chosen because it is already very popular with cyclists and the numbers of people using this route are likely to increase.

    Our scheme would create a greener, more pleasant space for local people and a convenient, safer and more direct cycle route for cyclists of all abilities. The proposals have been designed to improve safety and comfort for cyclists and pedestrians by reducing conflict with motorised traffic.
    The improvements include fully protected cycle tracks, greening measures, widened footways, safer junctions, pedestrian crossing points and new signs/ road markings. All of these are designed to make cycling and walking easier, safer and more enjoyable.

    This route would link to other Cycleways in the London cycling network, including a complimentary signed route to the recent improvements at Highbury Corner, and make it easier for local people of all ages to cycle and walk to local facilities such as leisure centres and shops.

    The wider cycle lanes will allow people with adapted cycles such as cargo bikes or cycles for disabled people to use the route more easily and make it safer for all vulnerable road users in line with the Vision Zero agenda, which aims to eliminate all deaths and serious injuries from our roads.
    What are Cycleways?

    Cycleways are continuous, clearly signed and convenient cycle routes which bring together all of the high-quality routes into a single London-wide network that is easy for everyone to understand and use.

    ProposalsDetailed maps are available at the bottom of the page.
    1. Blackstock Road/ Ambler Road Junction: Traffic lights would be introduced at the junction with new pedestrian crossings, providing early release for cyclists and cycle boxes on all arms. This design will significantly improve conditions for pedestrian and cyclists crossing Blackstock Road and allow cyclists to continue on the Cycleway route towards Finsbury Park. This proposal will involve the removal of a parking space on Somerfield Road and the Electric Vehicle charging point along Ambler Road would need to be relocated. The section towards Finsbury Park will be consulted on separately by Hackney Council. (see map section 1)

    2. Gillespie Road/ Avenell Road Junction: Priority at the junction would be reversed so that vehicles on Gillespie Road would give-way to vehicles on Avenell Road. This design would also raise the carriageway to footway level which would make it easier for crossing pedestrians and cyclists using the Cycleway to turn into Gillespie Road. (see map section 2)

    3. Gillespie Road Trial Arrangement: The ongoing trial point no-entry preventing traffic travelling westbound on Gillespie Road past the junction with St Thomas’s Road, is not being formally consulted on as part of the Cycleway proposals but we welcome feedback. (see map section 5)

    4. Drayton Park/ Aubert Park Junction: The existing mini-roundabout at the junction would be removed and changed to a priority (give-way) junction. The carriageway will be raised to footway level with pedestrian crossing points on all sides of the junction. This will raise awareness of the new Cycleway route and also make it easier for pedestrians to cross the road. The junction would prioritise movements on Drayton Park and traffic along Aubert Park would give-way. (see map section 3)

    5. Martineau Road – Aubert Park: Fully protected cycle facility at least 2.2m would be provided for northbound cycles between Martineau Road and Aubert Park. The proposal allows for southbound cyclists to mix comfortably with general traffic by adopting a position in the centre of the traffic lane, making them more visible to other traffic. The proposed design will maintain the existing number of parking spaces, however some parking bays would be relocated elsewhere between Martineau Road and Aubert Park to make room for improved cycle facilities. For the purposes of consultation, two design options for protecting cyclists are being considered, which we would like you to comment on. Examples are given below to illustrate the different design options. (see map section 3)

    • Kerb protected cycle tracks: the cycle track would be at the same level as the carriageway with a kerb installed to separate vehicles and cyclists. See below example from Cycle Superhighway 2 between Stratford and Aldgate.

    • Stepped cycle tracks: The cycleway would be installed halfway between the carriageway and footway. See below example from Midland Road in LB Camden.

    6. Benwell Road – Martineau Road: Fully protected cycle facilities would be introduced in both directions on this section of Drayton Park. The cycle tracks would be at least 2m wide in each direction and will also include a small strip that will physically protect cyclists from parked vehicles. The proposed design will maintain the existing number of parking spaces and access arrangements along Drayton Park. Existing zebra crossings will be raised to footway level improving pedestrian accessibility and safety. (see map section 3,4)

    7. Benwell Road/ Drayton Park Junction: The existing junction would be converted to a ‘continental-style’ roundabout which would include protected cycle facilities throughout the junction and new cycle crossings on all arms of the junction. The design will also significantly improve conditions for pedestrians by introducing new zebra crossings on all arms, raised surface and widened footways reducing crossing distances. (see map section 5)

    8. Highbury Crescent Signed Route: A complimentary signed route is proposed to connect up to the recent improvements at Highbury Corner. (see map section 6)

    Please sign in to vote.
  • Camden - Tottenham Hale cycle route

    Created by Simon Munk // 4 threads

    At approximately 12km, this route would connect the town centres of Tottenham Hale, Seven Sisters and the Nag's Head, making it easier for people to make local journeys and use local services. The route would use both main roads and quieter back streets.

    Please sign in to vote.
  • Hackney - Isle of Dogs cycle route

    Created by Simon Munk // 2 threads

    This 7.5km route would stretch from Hackney to the Isle of Dogs via Westferry, Mile End and Victoria Park. It would connect with the cycle routes between Stratford and Aldgate and Barking to Tower Hill, as well as the proposed Rotherhithe to Canary Wharf crossing. There are currently two options in Hackney we want your views on.

    Please sign in to vote.
  • TfL Proposals for Shoreditch High Street between Hackney Road and New Inn Yard

    Natalie G // 1 thread

    Junction of Shoreditch High Street with Rivington Street and Calvert Avenue:

    The following measures would make it safer and more comfortable for cyclists to travel east-west through this staggered junction across Shoreditch High Street:

    We would introduce a right-turn ban for all traffic except cycles exiting Rivington Street into Shoreditch High Street. This would improve safety for cyclists waiting to turn into Rivington Street and pedestrians using the nearby pedestrian crossing. Our latest traffic counts show a maximum of 33 vehicles per hour making this right turn, and we are satisfied alternative routes exist
    We would remove a southbound general traffic lane on Shoreditch High Street to accommodate two new right-turn pockets and three new traffic islands. The traffic islands would protect road users waiting to turn right into either Rivington Street (cycles only) or Calvert Avenue (all traffic)
    We would reduce the size of the footway by a small amount on the northern corner of Shoreditch High Street and Calvert Avenue to accommodate the turning movements of larger vehicles once the new traffic islands are in place
    Junction of Shoreditch High Street and Hackney Road:

    We would enlarge the traffic island to the west of the southbound slip road, reducing the carriageway width and the number of southbound lanes from two to one. This would create more footway space for pedestrians and reduce the distance people have to cross. Making this section of road a single lane for motor traffic would also create space for an advisory southbound cycle lane and reduce the likelihood of conflict between cyclists and motor traffic
    Shoreditch High Street:

    We would install a new southbound bus lane (operational Monday to Saturday, 7am to 7pm) in place of a general traffic lane from south of Rivington Street to the pedestrian crossing opposite New Inn Yard. This bus lane would also be available to cycles, taxis, motorcycles and coaches. The loading bay outside the Ace Hotel, and the existing bus stand and bus stops on Shoreditch High Street would not be affected by the bus lane

    Please sign in to vote.
  • Mare Street Cycle Link between London Lane and St Thomas’s Square Quietway 2

    Natalie G // 1 thread

    Overview

    This consultation document is about gathering views from the public on proposals to improve the crossing facility for cyclists across Mare Street, between London Lane and St Thomas’s Square.


    Why We Are Consulting

    The Council is committed to making Hackney’s roads safer for everyone living, working and visiting the borough. Creating an environment that will encourage more walking and cycling is a key part of the Council’s transport vision and an essential part of Hackney’s Transport Strategy.

    In spring 2013 the Mayor of London published his Cycling Vision for London – a 10 year strategy with approximately £1bn of investment, to increase the levels of cycling in London. One of the primary objectives of the strategy is to create a “tube network for the bike” – a mixture of fast commuter cycle routes offering dedicated cycle facilities on key main routes, complemented by a number of “Quietways”, which together will form a network of direct, joined-up cycle routes throughout London.

    Within the borough, Quietway 2: Bloomsbury to Walthamstow starts at the boundary with Islington by Southgate Road and runs eastwards to London Fields via Middleton Road, and then north-eastwards to Lea Bridge Road and the boundary with Waltham Forest.

    One of the key objectives of the Quietway routes is to link destinations, following backstreet routes, through parks, along waterways or treelined streets. The Quietways aim to overcome barriers to cycling, targeting cyclists who want to use quieter, low-traffic routes and providing an environment for those who want to travel at a gentler pace.

    A number of key issues have been identified along the route and Transport for London (TfL) has provided the Council with funding to make improvements. These include improving or upgrading specific locations such as junctions and crossings in order to improve safety and visibility and reduce the potential for accidents.

    Hackney Council is now consulting residents and businesses on a proposal to provide a safer link for cyclists using the Quietway 2 route across Mare Street.

    In addition to meeting the objectives of the ‘Quietways’, encouraging the use of cleaner and greener transport options (particularly cycling and walking) and reducing non-essential private car journeys are key long-term objectives for the Council due to the wide range of benefits these transport options can bring, including:

    • Reducing road accidents

    • Improving personal mobility

    • Creating safer, cleaner, and quieter residential neighbourhoods

    • Creating a successful balance between pedestrians and other modes of transport,

    in order to improve the pedestrian and cyclist experience

    • Improving pedestrian and cyclist crossing facilities

    More information on the Quietways can be found at:
    https://tfl.gov.uk/travel-information/improvements-and-projects/quietways


    The proposals include:

    1 a. Closing London Lane at its junction with Mare Street to all traffic except cyclists and emergency vehicles. This will provide a safer junction for all users. The junction will be raised and narrowed to improve pedestrian accessibility and encourage cyclists to slow down when approaching Mare Street. Bollards will be installed to prevent vehicles from using the junction illegally.

    b. An alternative measure could be to install a raised junction as above with ‘No Entry’ for vehicles from Mare Street. Vehicles would be allowed to turn left from London Lane, but right turns would be banned to keep the central refuge clear for cyclists.

    2 The Quietway route between London Lane and the north side of St Thomas’s square

    crosses Mare Street. All traffic can enter St Thomas’s Square (north) from Mare Street.

    Motor vehicles will be banned from turning right when exiting the north side of St

    Thomas’s Square, but cycles will be allowed to turn right.

    3 The existing islands on Mare Street will be widened to provide a safer central refuge space for cyclists waiting to cross the carriageway.

    4 There will be a new island on Mare Street to protect cyclists turning right on to the northern arm of St Thomas’s Square. Extra protection is needed as other vehicles travelling north on Mare Street are also able to turn right (see point 2. above)

    • Lower Clapton Road parallel zebra and cycle crossings

    • Morning Lane parallel zebra and cycle crossings

    • London Fields/Middleton Road Traffic Management Scheme

    Please sign in to vote.
  • Chatsworth Road/Millfields Road/Powerscroft Road New Signalised Junction

    Natalie G // 1 thread

    Part of the Quietway 2 scheme to facilitate crossing of Chatsworth Road.
    Deadline is 25 November 2016 - so please let us have comments by 18 November 2016 at the latest.

    The proposals include:

    1 Replacing the existing zebra crossing with traffic signals at the Chatsworth Road\ Millfields Road\ Powerscroft Road junction. This will be designed to make the junction easier and safer for pedestrians and cyclists as there have been a total of seven accidents in recent years. Six of these involved cyclists. There will be a Green Man crossing on each approach to the junction and one that will replace the zebra crossing.

    2 Introducing a raised table across the junction of Chatsworth Road and Millfields Road to reduce traffic speeds.

    3 Creating a new link and crossing for cyclists between Powerscroft Road and Millfields Park. This will be a new shared space with the route for cyclists clearly marked for the benefit of all users. New cycle stands will also be installed.

    4 Introducing new footway into the western arm of Millfields Road as part of the shared space. The existing barrier will be replaced with a lockable bollard and new trees.

    5 Extending double yellow lines on the south side of Millfields Road, up to the junction with Sewdley Street to facilitate safe bus and traffic movement.

    6 Removing two parking bays on Powerscroft Road at the junction with Chatsworth Road to improve cycle access and the bus alignment approaching the junction.

    7 Relocating the Disabled bay outside No. 176 Chatsworth Road and removing one parking space to increase visibility at the new crossing point.

    8 Extending the footway to reduce the pedestrian crossing distance and reduce traffic speed.

    Please sign in to vote.
  • Chatsworth Road/Millfields Road/Powerscroft Road New Signalised Junction

    Natalie G // 0 threads

    The proposals include:

    1 Replacing the existing zebra crossing with traffic signals at the Chatsworth Road\ Millfields Road\ Powerscroft Road junction. This will be designed to make the junction easier and safer for pedestrians and cyclists as there have been a total of seven accidents in recent years. Six of these involved cyclists. There will be a Green Man crossing on each approach to the junction and one that will replace the zebra crossing.

    2 Introducing a raised table across the junction of Chatsworth Road and Millfields Road to reduce traffic speeds.

    3 Creating a new link and crossing for cyclists between Powerscroft Road and Millfields Park. This will be a new shared space with the route for cyclists clearly marked for the benefit of all users. New cycle stands will also be installed.

    4 Introducing new footway into the western arm of Millfields Road as part of the shared space. The existing barrier will be replaced with a lockable bollard and new trees.

    5 Extending double yellow lines on the south side of Millfields Road, up to the junction with Sewdley Street to facilitate safe bus and traffic movement.

    6 Removing two parking bays on Powerscroft Road at the junction with Chatsworth Road to improve cycle access and the bus alignment approaching the junction.

    7 Relocating the Disabled bay outside No. 176 Chatsworth Road and removing one parking space to increase visibility at the new crossing point.

    8 Extending the footway to reduce the pedestrian crossing distance and reduce traffic speed.

    Please sign in to vote.
  • Chatsworth Road/Millfields Road/Powerscroft Road New Signalised Junction

    Natalie G // 0 threads

    The proposals include:

    1 Replacing the existing zebra crossing with traffic signals at the Chatsworth Road\ Millfields Road\ Powerscroft Road junction. This will be designed to make the junction easier and safer for pedestrians and cyclists as there have been a total of seven accidents in recent years. Six of these involved cyclists. There will be a Green Man crossing on each approach to the junction and one that will replace the zebra crossing.

    2 Introducing a raised table across the junction of Chatsworth Road and Millfields Road to reduce traffic speeds.

    3 Creating a new link and crossing for cyclists between Powerscroft Road and Millfields Park. This will be a new shared space with the route for cyclists clearly marked for the benefit of all users. New cycle stands will also be installed.

    4 Introducing new footway into the western arm of Millfields Road as part of the shared space. The existing barrier will be replaced with a lockable bollard and new trees.

    5 Extending double yellow lines on the south side of Millfields Road, up to the junction with Sewdley Street to facilitate safe bus and traffic movement.

    6 Removing two parking bays on Powerscroft Road at the junction with Chatsworth Road to improve cycle access and the bus alignment approaching the junction.

    7 Relocating the Disabled bay outside No. 176 Chatsworth Road and removing one parking space to increase visibility at the new crossing point.

    8 Extending the footway to reduce the pedestrian crossing distance and reduce traffic speed.

    Please sign in to vote.
  • QW2: Morning Lane cycle crossing

    Created by Harry Fletcher-Wood // 1 thread

    As part of the Quietway 2 route, Hackney Council propose a cycle crossing, raised table and motor vehicle restrictions at the crossing of Morning Lane.

    Looks good at first sight, if you have any thoughts about the scheme please could you add them by Friday, 5th August, so that Harry and Natalie can draft a group response.

    Please sign in to vote.
  • QW2: Lower Clapton Road & Clarence Place Consultation

    Created by Harry Fletcher-Wood // 1 thread

    As part of the Quietway 2 proposals, Hackney Council are proposing to remove through traffic from Clapton Square through the use of two modal filters. They are also proposing a new cycle crossing of Lower Clapton Road, with a raised table and a parallel zebra crossing alongside it.

    The proposals look good at first glance, but any detailed comments would be helpful.

    Please respond by Friday 5th August so that Natalie and Harry can draft a response representing Hackney Cycling Campaign's position.

    Please sign in to vote.

112 threads found for 'quietway':

No library items found for 'quietway'.

No planning applications found for 'quietway'.

Back to top